Formwork carpentry and steel fixing works during the construction of the ‘B-Wing in the Gynaecological Building with a Connecting Passage’ in Szczecin – as a subcontractor of the company Lepiko Sp. z o.o.
Projects » Construction of the B-Wing in the Gynaecological Building with a Connecting Passage in Szczecin
concrete: 230 m3, steel: 24 t.
2018.12. – 2019.01